0502358145

Emergency call

0502358145

Emergency call

Peterson Residence – Seattle, WA

Project Information

Clients Abdullah Al-Mutairi
Category
locations Dammam, Saudi Arabia
Date 31 March 2024 - 24 May 2024

Send Us mail


    Peterson Residence – Seattle, WA

    Abdullah Al-Mutairi requested a full water pipe system upgrade for his residential property in Dammam. The existing pipelines were old and caused inconsistent water pressure and occasional minor leaks. Our team from Hiba Al-Enjaz Services conducted a detailed assessment, replacing outdated pipes with high-quality PPR piping and installing modern valves for better water flow management.

    Each connection was carefully sealed, and the system was tested for leak-free performance and optimal water pressure. The client received a comprehensive report detailing the installation process, system layout, and maintenance recommendations to ensure long-term durability and efficiency.

    Project Values

    Hiba Al-Enjaz Services successfully upgraded the water pipe system at Abdullah Al-Mutairi’s residence in Dammam, Saudi Arabia. The project involved replacing old pipelines with high-quality PPR pipes, installing modern valves, and ensuring leak-free connections.

    The upgraded system provided consistent water pressure throughout the house, eliminated minor leakage issues, and improved overall efficiency. After installation, the system was thoroughly tested, and the client received a detailed report including maintenance tips and preventive measures. Abdullah Al-Mutairi was highly satisfied with the professional, efficient, and clean service, reflecting Hiba Al-Enjaz Services’ expertise in residential plumbing solutions.

    Project Challanges

    1
    Connecting new pipes with old pipelines without disruption.
    2
    Ensuring all joints and connections were completely leak-free.
    3
    Working efficiently in tight residential areas, including under sinks and cabinets.
    4
    Completing work without affecting the client’s daily routine.
    5
    Maintaining high safety standards and workmanship quality throughout the project.